Development potential analysis
111 CANTERBURY ROAD CANTERBURY 3126
The parcel
- Lot area
- 873 m²
- Frontage
- 15.2 m
- Depth
- 57.3 m
- Corner lot
- No
- Zone
- GRZ5
- Overlays
- None on this parcel
Location
© OpenStreetMap contributors · -37.82261, 145.07295
Recommended yield
Highest-utilisation combination under Clause 32.08 controls — applies state Clause 55 garden, tree canopy, and permeability standards plus zone setback defaults.
- Total dwellings
- 7
- Total bedrooms
- 14
- Total GFA
- 608 m²
- FSR
- 69.6%
Feasibility model
| Estimated land value | $6.45M |
| Build cost (incl. fees + contingency) | $2.92M |
| Total project cost | $11.92M |
| Projected revenue (net of GST) | $15.25M |
| Estimated profit | $3.32M |
Land value: suburb median × (lot area / 600) × 0.85. Build: $2,700/m² × total GFA (Victorian standard townhouse rate). Holding: 6.4% × 1.5 yr on land + half construction. GST: margin scheme (1/11 of revenue − land).
▸▾How this estimate was calculated
Residual land value method. The model works backwards from what a finished development could sell for, then subtracts every cost to arrive at the residual — what a developer could pay for the land and still make a return.
Revenue is the sum of estimated sale prices for each dwelling in the recommended mix (2-, 3-, and 4-bedroom townhouses) priced from suburb-level median comparable sales, net of GST under the margin scheme (1/11 of the margin between sale price and land cost).
Build cost uses the Rawlinsons 2026 Victorian standard townhouse rate of $2,700/m² applied to total gross floor area from the yield model, plus 12% professional fees (architects, engineers, town planning), 5% contingency, demolition (~$25k), landscaping (~$200/m² of external area), services connection (~$28k), and statutory levies (~$1,500 per dwelling infrastructure + $2,000 per lot subdivision).
Holding costs apply the RBA cash rate (6.4% as at model calibration) over 1.5 years on the land value plus half the construction draw — reflecting a typical Victorian townhouse construction programme with staggered drawdowns.
Land value is estimated as suburb median land price × (lot area ÷ 600) × 0.85. The 600 m² denominator is the benchmark lot for Victorian pricing; 0.85 is a conservative discount for development-grade parcels transacting below median residential.
Margin on cost = profit ÷ total project cost × 100. Priority band ≥ 30%; Marginal band 20–30%. Sites below 20% are not shown publicly.
All inputs are indicative. Actual costs depend on soil conditions, heritage requirements, design, contractor pricing, and council overlay conditions. Verify with a quantity surveyor and town planner before proceeding.
Listing status
Not currently listed for sale on Domain or realestate.com.au.
Are you the owner of this site?
If you'd ever consider selling to a developer, list it on SiteLogic free. We don't take a commission — we monetise developer subscriptions instead. Your contact details stay private until you choose to share them.
List this site free →Developer? Express interest
Get notified if the owner lists this site, or if a similar parcel comes on-market within 2km.