Stonnington Planning Scheme · GRZ15

Schedule 15 to the General Residential Zone

Schedule 15 as amended by C223, gazetted

Source retrieved . Source checked .

Open the schedule source

What height does GRZ15 record in Stonnington?

Maximum building height: 12 m and 3 storeys. Section 4.0.
A building used as a dwelling, small second dwelling or a residential building must not exceed a height of 12 metres and three storeys.

Source: Schedule 15 to Clause 32.08, section 4.0. Section 4.0 as amended by VC255, gazetted 3 May 2024. Source checked 9 November 2026. Source retrieved 9 November 2026.

What street setback does GRZ15 record?

What site coverage does GRZ15 record?

Does Schedule 15 exempt dwellings from the minimum garden area requirement?

The schedule states a garden area exemption.
Is the construction or extension of a dwelling, small second dwelling or residential building exempt from the minimum garden area requirement? Yes

Source: Schedule 15 to Clause 32.08, section 2.0. Section 2.0 as amended by VC255, gazetted 3 May 2024. Source checked 9 November 2026. Source retrieved 9 November 2026.

This is a dated summary of recorded controls. Check the current planning scheme and seek site-specific advice. This page does not confirm development approval or feasibility.