Maribyrnong Planning Scheme · GRZ3
Schedule 3 to the General Residential Zone
Schedule 3 as amended by C162mari, gazetted
Source retrieved . Source checked .
What height does GRZ3 record in Maribyrnong?
- Maximum building height: 13.5 m and 4 storeys. Section 4.0.
A building used as a dwelling, small second dwelling or a residential building must not exceed a height of 13.5 metres and 4 storeys.
What street setback does GRZ3 record?
- Section 3.0 of this schedule specifies no street setback. Standard B2-1 in Clause 55 applies. Check the clause before relying on it.
What site coverage does GRZ3 record?
- Site coverage limit: 80%. Section 3.0.
Standard B2-5, two or more dwellings on a lot
B2-5 80 per cent
Does Schedule 3 exempt dwellings from the minimum garden area requirement?
- The schedule states a garden area exemption.
Is the construction or extension of a dwelling, small second dwelling or residential building exempt from the minimum garden area requirement? Yes
This is a dated summary of recorded controls. Check the current planning scheme and seek site-specific advice. This page does not confirm development approval or feasibility.
Check a Victorian address
Start with the free address check.
Check an address