Macedon Ranges Planning Scheme · NRZ4

Schedule 4 to the Neighbourhood Residential Zone

Schedule 4 as amended by C98, gazetted

Source retrieved . Source checked .

Open the schedule source

What height does NRZ4 record in Macedon Ranges?

Maximum building height: 9 m and 2 storeys. Section 4.0.
A building used as a dwelling, small second dwelling or a residential building must not exceed a height of 9 metres and 2 storeys.

Source: Schedule 4 to Clause 32.09, section 4.0. Section 4.0 as amended by VC255, gazetted 3 May 2024. Source checked 9 November 2026. Source retrieved 9 November 2026.

What subdivision area does NRZ4 record?

What street setback does NRZ4 record?

What site coverage does NRZ4 record?

This is a dated summary of recorded controls. Check the current planning scheme and seek site-specific advice. This page does not confirm development approval or feasibility.

Check a Victorian address

Start with the free address check.

Check an address