Greater Dandenong Planning Scheme · GRZ3

Schedule 3 to the General Residential Zone

Schedule 3 as amended by C213gdan, gazetted

Source retrieved . Source checked .

Open the schedule source

What height does GRZ3 record in Greater Dandenong?

What street setback does GRZ3 record?

What site coverage does GRZ3 record?

Site coverage limit: 70%. Section 3.0.

Standard B2-5, two or more dwellings on a lot

B2-5 The site area covered by buildings should not exceed 70 per cent.

Source: Schedule 3 to Clause 32.08, section 3.0, Standard B2-5, two or more dwellings on a lot. Section 3.0 as amended by VC282, gazetted 8 September 2025. Source checked 9 November 2026. Source retrieved 2 November 2026.

Does Schedule 3 exempt dwellings from the minimum garden area requirement?

The schedule states a garden area exemption.
Is the construction or extension of a dwelling, small second dwelling or residential building exempt from the minimum garden area requirement? Yes

Source: Schedule 3 to Clause 32.08, section 2.0. Section 2.0 as amended by VC252, gazetted 26 April 2024. Source checked 9 November 2026. Source retrieved 2 November 2026.

This is a dated summary of recorded controls. Check the current planning scheme and seek site-specific advice. This page does not confirm development approval or feasibility.