Casey Planning Scheme · GRZ2
Schedule 2 to the General Residential Zone
Schedule 2 as amended by C198case, gazetted
Source retrieved . Source checked .
What height does GRZ2 record in Casey?
- Maximum building height: 11.5 m and 3 storeys. Section 4.0.
A building used as a dwelling, small second dwelling or a residential building must not exceed a height of 11.5 metres and 3 storeys.
What street setback does GRZ2 record?
- Minimum street setback: 5 m (at least 5 metres or in accordance with the table in Standard B2-1, whichever is the lesser). Section 3.0.
Standard B2-1, two or more dwellings on a lot
B2-1 Walls of buildings are set back from the front street at least 5 metres or in accordance with the table in Standard B2-1, whichever is the lesser. Side street setback requirements specified in the table to Standard B2-1 continue to apply.
What site coverage does GRZ2 record?
- Section 3.0 of this schedule specifies no site coverage. Standard B2-5 in Clause 55 applies. Check the clause before relying on it.
Does Schedule 2 exempt dwellings from the minimum garden area requirement?
- The schedule does not provide a garden area exemption.
Is the construction or extension of a dwelling, small second dwelling or residential building exempt from the minimum garden area requirement? No
This is a dated summary of recorded controls. Check the current planning scheme and seek site-specific advice. This page does not confirm development approval or feasibility.