Bayside Planning Scheme · GRZ17
Schedule 17 to the General Residential Zone
Schedule 17 as amended by C160bays, gazetted
Source retrieved . Source checked .
What height does GRZ17 record in Bayside?
- Section 4.0 of this schedule specifies no height. The Clause 32.08 requirement applies. Check the clause before relying on it.
What street setback does GRZ17 record?
- Minimum street setback: 3 m (in Train Street). Section 3.0.
Standard B2-1, two or more dwellings on a lot
B2-1 Walls of buildings in Train Street are set back at least 3 metres from the frontage. Side street setback requirements specified in the table to Standard B2-1 continue to apply.
What site coverage does GRZ17 record?
- Section 3.0 of this schedule specifies no site coverage. Standard B2-5 in Clause 55 applies. Check the clause before relying on it.
Does Schedule 17 exempt dwellings from the minimum garden area requirement?
- The schedule states a garden area exemption.
Is the construction or extension of a dwelling, small second dwelling or residential building exempt from the minimum garden area requirement? Yes
This is a dated summary of recorded controls. Check the current planning scheme and seek site-specific advice. This page does not confirm development approval or feasibility.
Check a Victorian address
Start with the free address check.
Check an address