Bayside Planning Scheme · GRZ13
Schedule 13 to the General Residential Zone
Schedule 13 as amended by C160bays, gazetted
Source retrieved . Source checked .
What height does GRZ13 record in Bayside?
- Maximum building height: 14 m and 4 storeys. Section 4.0.
A building used as a dwelling, small second dwelling or a residential building must not exceed a height of 14 metres and 4 storeys.
What street setback does GRZ13 record?
- Minimum street setback: 3 m. Section 3.0.
Standard B2-1, two or more dwellings on a lot
B2-1 Walls of buildings are set back at least 3 metres from the frontage. Side street setback requirements specified in the table to Standard B2-1 continue to apply.
What site coverage does GRZ13 record?
- Section 3.0 of this schedule specifies no site coverage. Standard B2-5 in Clause 55 applies. Check the clause before relying on it.
Does Schedule 13 exempt dwellings from the minimum garden area requirement?
- The schedule states a garden area exemption.
Is the construction or extension of a dwelling, small second dwelling or residential building exempt from the minimum garden area requirement? Yes
This is a dated summary of recorded controls. Check the current planning scheme and seek site-specific advice. This page does not confirm development approval or feasibility.
Check a Victorian address
Start with the free address check.
Check an address