Photo: SiteLogic editorial imageTax
Windfall gains tax: the pre-existing contract and charity exemptions
How the windfall gains tax exemptions for pre-existing contracts and charitable landowners work, and what evidence the SRO expects to support a claim.
What applies
Windfall gains tax (WGT) taxes the uplift in a parcel's value when planning authorities rezone it, above a taxable value threshold set out in the Windfall Gains Tax and Rezoning Act 2021. A rezoning that lifts a site from a lower-value zone to a higher-value one, for example a rural zone to a residential growth zone, can trigger a liability assessed on the difference in capital improved value before and after the amendment. Confirm the current taxable value threshold and rate structure on the SRO windfall gains tax page before modelling any acquisition that includes a rezoning play.
The Act carves out several situations where a rezoning does not attract WGT, or where liability is deferred rather than crystallised at the rezoning date. Two of the more commercially relevant exclusions for developers assembling sites are the pre-existing contract exemption and the exemption for land owned by charities. Both require the landowner to hold a specific status or arrangement in place before the rezoning takes effect, which means the paperwork trail matters as much as the substantive test.
The pre-existing contract exclusion
The pre-existing contract exclusion is a transitional provision. It recognises that a landowner may have entered a binding contract of sale, or an option, before the tax was announced on 15 May 2021, and should not be taxed on an uplift they had already agreed to transfer away under terms fixed at an earlier value. The Act ties the exclusion to that single fixed date: it applies only where the contract of sale or option was entered into before 15 May 2021 and had not been completed when the rezoning took effect. It is not a rolling test keyed to each later rezoning, so a contract entered into after 15 May 2021 does not qualify, however far ahead of the rezoning it was signed.
For a developer buying into a site mid-rezoning, this exclusion is not something you claim on the buyer's behalf by default. It attaches to specific transactional facts about whether the contract or option was entered into before 15 May 2021. If you are relying on a vendor's representation that WGT will not apply because of a pre-existing contract, treat that as a claim to be verified, not a settled fact. Ask for the contract date, the option deed if one exists, and any correspondence that establishes when the arrangement was struck. The SRO's assessment process will test the same facts, so the file needs to survive that scrutiny independently of what the vendor tells you.
The charitable land exemption
The Act also exempts land where the landowner is a charity and the land is used, or intended to be used, for charitable purposes, subject to conditions on continued charitable use after the rezoning. This matters where a developer is negotiating with a church, school, hospital or other charitable landholder over land that may be rezoned as part of a broader precinct structure plan or amendment. The exemption is conditional, not absolute: if the land stops being used for charitable purposes within a period after the rezoning, the exemption can be clawed back and WGT can become payable retrospectively.
That clawback exposure is the detail developers most often miss. A contract to purchase charity land conditional on rezoning should address who bears a WGT liability if the charitable-use condition is not maintained through to settlement, and for how long after settlement the vendor's charitable status needs to persist for the exemption to hold. This is a drafting point for the contract of sale, not something a feasibility model can absorb after the fact.
How to model it
Do not build a specific WGT dollar figure into an early feasibility unless a rezoning has already been gazetted and an assessment issued. Before that point, treat WGT as a contingent liability line with a wide range, flagged for update once the rezoning outcome and the applicable rate are known from the SRO. Where you are assessing whether an exemption is likely to apply, build two scenarios: one where the exemption holds and WGT is nil, and one where it is challenged or does not apply, so the feasibility shows the downside rather than assuming the best case.
The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. Say a parcel's capital improved value rises from $2,000,000 pre-rezoning to $3,200,000 post-rezoning, an uplift of $1,200,000. If no exemption applies, that uplift (less the taxable value threshold, and subject to the current rate confirmed on the SRO page) becomes the base for the WGT calculation. If a pre-existing contract exclusion is established for the whole uplift, the WGT base falls to nil for that transaction. The gap between those two outcomes is exactly the kind of swing a feasibility should carry as a range, not a single assumed number, until the exemption claim is tested.
What to check before exchange
Before you exchange on a site where a rezoning has occurred, is imminent, or is a condition of the deal, request the vendor's WGT position in writing: whether an assessment has issued, whether an exemption has been claimed, and on what basis. Ask for the underlying documents, not just the conclusion, contract dates and option deeds for a pre-existing contract claim, or evidence of charitable status and intended use for a charitable-land claim. Confirm with your own adviser whether the exemption is likely to be accepted on the facts you have been given, because the SRO's assessment is independent of anything the vendor asserts in the contract.
Where the rezoning has not yet happened but is anticipated, build the WGT contingency into your offer structure, either through a price adjustment mechanism tied to the eventual assessment or through an allocation of liability clause that says clearly who pays if WGT is assessed after settlement. Silence on this point in a contract of sale for a site with a live or anticipated rezoning is a common and expensive gap.
Record keeping and review
Keep every document that supports an exemption claim in the project file from the outset: contract execution dates, option deeds, correspondence establishing when a rezoning became known, and any charitable-status documentation. These are the same materials the SRO will request if it reviews the position, and reconstructing them years after settlement is far harder than filing them as you go. WGT exemptions are fact-specific and contestable, so where a claim is not clear-cut, get advice from a tax specialist before relying on it in a purchase decision, and revisit the position if the SRO's guidance or the Act changes.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Fact-checked: 19 July 2026 · Review by: 19 July 2027
Sources: legislation.vic.gov.au · sro.vic.gov.au
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.