Back to Journal
The off-the-plan duty concession: eligibility and mechanicsPhoto: SiteLogic editorial image

Tax

The off-the-plan duty concession: eligibility and mechanics

How Victoria's off-the-plan duty concession reduces dutiable value by excluding post-contract construction cost, who can rely on it, and what it means for a developer's sales campaign.

·Written and fact-checked . Published .·6 min read

What applies

Land transfer duty is normally assessed on the full contract price. The off-the-plan concession is an exception to that starting point, built into the dutiable value rules in the Duties Act 2000. Where an eligible off-the-plan contract is used to buy an apartment, townhouse or unit that is still under construction or yet to be built, the dutiable value used to calculate duty can be lower than the price actually paid, because the formula strips out the value of construction or refurbishment that happens after the contract date.

The reasoning is straightforward once you see it. Duty is meant to tax the value of the land and any building that exists at the point of the transaction, not value that has not been created yet. A buyer who signs before the slab is poured is, in substance, buying a promise to build as much as they are buying a finished dwelling. The SRO's off-the-plan concession guidance sets out the calculation method, and the Duties Act 2000 is the underlying legislative source.

What applies to eligibility

Not every off-the-plan contract qualifies, and eligibility has been the subject of change over time, including how the concession interacts with the principal place of residence concession and first home buyer settings. Because of that history, do not treat any general description of who qualifies as current. The buyer's intended use of the property, whether the contract is genuinely for a dwelling still under construction, and the specific drafting of the contract can all affect eligibility. Confirm the current eligibility criteria on the SRO page before relying on the concession in any transaction, whether you are advising a buyer or marketing a project to one.

How to model it

The core mechanic is a subtraction: dutiable value equals the contract price, less the value of construction or refurbishment work carried out on or after the contract date. The earlier in the build program a buyer signs, the larger the share of the eventual finished value that falls into the not-yet-built category at contract date, and the larger the reduction in dutiable value relative to the price paid. A buyer who exchanges at the display-suite stage, before excavation, is in a different position under the formula to a buyer who exchanges when the building is fully framed and being fitted out.

For a developer, this has a direct commercial consequence. Selling early in the construction program, which developers already want to do to support presale finance conditions, also tends to produce the largest duty concession for the buyer under this formula. That alignment is worth stating plainly in a sales campaign as a genuine, structural feature of buying early rather than a marketing embellishment. What it does not license is quoting a specific dollar saving as a fact in marketing material, because the actual duty payable by any individual buyer depends on their own eligibility, the exact contract date, and the construction split at that date, none of which a general sales brochure can determine for every purchaser.

What to check before exchange

From a developer's side, check that the contract of sale correctly identifies the contract date and is drafted in a way that supports a clean split between land value and post-contract construction value, since ambiguous drafting can make it harder for a buyer's conveyancer to substantiate the claimed dutiable value with the SRO. Work with your solicitor to confirm the standard contract terms used across a project are consistent with current SRO practice, rather than relying on a template that has not been checked against the current guidance.

From a buyer's side, or when advising one, confirm current eligibility before exchange, not after, since the concession is applied through the dutiable value calculation at the time duty is assessed. Buyers should get their own advice on whether they personally qualify, given eligibility can depend on how the property will be used, rather than assuming every off-the-plan purchase in a development qualifies equally.

Practical steps for a sales campaign

If a concession like this is part of your value proposition to buyers, describe the mechanism accurately: an off-the-plan contract can reduce the dutiable value against which duty is calculated, with the size of the reduction linked to how much of the build is still ahead of the contract date. Point buyers to the SRO's own guidance and calculator to work out their individual position, rather than stating a saving figure in your own marketing collateral. This protects both the buyer, who gets an answer specific to their circumstances, and the developer, who avoids the risk of a marketing claim that turns out not to match a particular buyer's actual duty assessment.

It is also worth briefing sales staff on the mechanism in plain terms, so the concession is explained consistently and accurately at the point of sale, rather than left to informal explanations that vary between staff members and can diverge from what the Act and the SRO actually provide.

Interaction with other concessions

The off-the-plan concession does not operate in isolation. A buyer's final duty position also depends on whatever else applies to their purchase, including the principal place of residence concession and any first home buyer settings that are current at the time. Because these concessions interact with each other through the same dutiable value calculation, working out a buyer's total duty payable is rarely a single lookup against one rate table. It is a sequence: first establish the dutiable value under the off-the-plan formula, then apply whichever further concession or exemption the buyer separately qualifies for on that reduced figure.

This matters for a developer's marketing in a second way. Two buyers signing an identical contract on the same day, at the same price, can end up with materially different duty bills once their personal eligibility for the other concessions is taken into account. A first home buyer and an investor buying an identical unit from the same release are not comparable cases, and sales collateral that quotes one buyer's outcome as though it were general should be avoided. Refer each buyer to the SRO's own tools to work out their combined position rather than assuming the off-the-plan reduction tells the whole story.

An illustrative calculation

The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. Take an off-the-plan apartment contract signed for a round $700,000, at a stage where the land and existing works are valued at $250,000 as at the contract date, with the remaining $450,000 representing construction still to be carried out after that date. Under the off-the-plan formula, the dutiable value used to calculate duty could be based on the $250,000 land component rather than the full $700,000 contract price, before duty is then calculated on that lower figure at whatever rate applies under the Act at the relevant time. Every number in this example is a placeholder for the method. Confirm the actual eligibility position, the actual construction split for a specific contract, and the actual duty payable using the SRO's calculator and current guidance before relying on any of it.


Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.

Fact-checked: 19 July 2026 · Review by: 19 July 2027

Sources: sro.vic.gov.au · legislation.vic.gov.au

Our standards·

Share this article

Get new articles by email

Weekly digest of new articles. No spam. Unsubscribe any time.

Was this useful? Try the tool this post is based on:

Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.

See Pro pricingFree tier stays free.