Sub-sales and nominations: the double duty trap
How Victoria's sub-sale provisions can impose duty on both an original contract and a later nomination or on-sale, and what to lock down before exchange to avoid it.
What the sub-sale provisions target
The Duties Act 2000 is built around a simple picture: a single dutiable transaction, vendor to purchaser, one transfer registered at the titles office. Property deals rarely stay that simple. A purchaser under a contract might nominate a related entity to take the transfer at settlement. Someone holding a contractual right might assign or on-sell that right to a third party before completion. Both moves shift beneficial ownership of the land without a second registered transfer ever appearing on title.
The sub-sale provisions exist because that informal second transfer used to escape duty altogether. If land changed hands only once at the titles office, vendor to final nominee, duty was assessed once no matter how many parties passed through the contractual chain beforehand. The rules close that gap by treating a qualifying nomination or on-sale as a dutiable transaction in its own right, on top of the original contract.
For anyone assembling a Victorian development site through nominee purchases, related-entity transfers, or staged options, this is one of the highest-consequence parts of the Act to get wrong. Settle the structure before exchange and the deal proceeds as planned. Get it wrong and the State Revenue Office can assess duty twice on the one parcel.
What applies
A sub-sale, in the sense the Act uses the term, arises where a person holding rights under a contract of sale enters into a further arrangement, before that contract settles, with the effect of directing beneficial ownership, or the economic benefit of the land, to a third party. That further arrangement can take the form of a nomination, an assignment of the purchaser's rights, exercise of a call option in favour of another party, or a sub-sale contract in the ordinary sense.
Where the provisions apply, the SRO can assess duty on both transactions: the original contract and the sub-sale or nomination. Practitioners call this the double duty outcome. The same parcel attracts duty twice, because two dutiable transactions occurred on the way to final settlement, even though only one transfer is ever registered.
The Act carves out exemptions for some nominations, particularly where a purchaser nominates a related or associated entity, no additional consideration changes hands, and the nomination is disclosed within specified time limits. These exemptions are drawn narrowly. Whether one applies turns on the specific facts of the nomination: how it is documented, when it is disclosed, whether consideration passes, and the relationship between transferee and nominee.
This is a contested, fact-specific area of the Act. Do not assume a related-party nomination is exempt by default. Get the sub-sale provisions checked against the actual deal documents by a duties specialist before relying on any exemption, and treat the Duties Act 2000 and the SRO's own published guidance as the only authorities worth relying on here.
How to model it
In a feasibility, flag any deal structure involving more than a straight vendor-to-purchaser transfer as a potential double-duty event until a duties specialist confirms otherwise. That includes:
- Buying through a newly formed entity whose final structure has not settled by exchange.
- Any arrangement where a related trust, company, or joint venture vehicle might be nominated to take the transfer.
- Option arrangements where the option holder might assign the benefit of the option before it is exercised.
- Staged acquisitions where a head contract is later split into parcels or on-sold to different development entities.
Until the structuring question is resolved, carry a contingent duty line equal to a second full round of duty on the site value. Treat this as a placeholder that forces the structuring conversation. Do not publish it as a committed cost. Once the adviser confirms which limb of the sub-sale provisions applies, or that an exemption is available, replace the placeholder with the confirmed position.
What to check before exchange
The most effective way to avoid the double duty trap is to fix the acquiring entity before the contract is signed. Once exchange has happened, any later change in who ultimately takes the transfer becomes a candidate for sub-sale scrutiny. Before exchange:
- Decide the final holding entity, whether an SPV, trust, or joint venture vehicle, and have it in existence and ready to contract rather than planning to nominate it in later.
- If nomination genuinely cannot be avoided, for example because the entity is still being incorporated, get written advice on whether the specific nomination clause preserves any available exemption before relying on it.
- Read the nomination clause in the contract itself. Confirm whether it permits nomination without further valuable consideration, and confirm the time limit within which nomination must occur.
- Check the SRO's sub-sale provisions guidance directly rather than relying on general commentary, since the SRO's interpretation of a dutiable sub-sale is specific and is updated from time to time.
- Where a call option or other conditional right forms part of the structure, get separate advice on how the sub-sale provisions treat assignment or exercise of that right. Options raise duty questions distinct from a straightforward nomination.
Interaction with other duty regimes
Sub-sale duty rarely sits on its own. Where the final acquiring entity is a trust or company that holds, or will hold, a majority interest in landholding entities, landholder duty questions can be triggered by the same restructuring that raises a sub-sale question. Arrangements that confer an economic benefit in the land on a third party without a formal transfer can also intersect with the economic entitlement provisions of the Act. Both landholder duty and economic entitlement are contested, fact-specific areas in their own right. Treat any deal with more than one moving structural part as one case for a single duties adviser to review end to end, rather than assessing each provision in isolation.
Illustrative example
The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. Take a development site under contract for $3,000,000. If the sub-sale provisions apply to a later nomination and no exemption is available, the SRO could in principle assess duty on the original contract and again on the sub-sale, rather than once on a $3,000,000 transaction. Carrying this as a contingent second duty liability, rather than assuming a single duty line, is the discipline that protects the feasibility until the structuring question is actually resolved. Confirm the current duty rates and thresholds on the SRO's own rate pages before applying any figure to a live deal; this example exists only to show why a contingent line belongs in the model. It does not represent an actual dollar cost.
Record keeping and review
Because sub-sale assessments turn heavily on timing and documentation, keep a clear paper trail: the date of the original contract, the date and form of any nomination or assignment, and any advice received on the point. If the SRO reviews the transaction, the sequence and documentation of the nomination determines the outcome. The commercial intent behind it matters less. Build this record keeping into the conveyancing file from exchange, before any nomination occurs.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Fact-checked: 19 July 2026 · Review by: 19 July 2027
Sources: legislation.vic.gov.au · sro.vic.gov.au
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.