Sensitivity testing a feasibility: rates up 50 and 100 basis points
A step-by-step sensitivity test for a Victorian development feasibility, with the arithmetic for a rise of 50 and 100 basis points and a comparison against a fall in sale prices.
A feasibility is a prediction wrapped in a spreadsheet. The honest way to use it is to push on each input and see what breaks first. Interest is the input that has moved most this year, so it deserves a proper test.
The RBA's cash rate table shows four rises in 2026, each of 25 basis points, taking the target from 3.60% to 4.60%. That is 100 basis points in total. The Board held in June and August. The RBA's 29 September statement says it will do what it considers necessary to bring inflation back to target, including further increases if needed. A test of plus 50 and plus 100 basis points is a stress test. It says nothing about what the Board will do.
Set the baseline first
Write down the rate the model uses and where it comes from. SiteLogic's feasibility default for the holding loan is the cash rate plus a 3.5 point lender margin, which is 8.10% at a 4.60% cash rate. Your lender's term sheet overrides any default.
Write down the interest base: the average drawn balance and the months it is carried. Interest is not the facility size times the rate. It is the average balance times the rate times the time.
A worked example
The following figures are illustrative. They demonstrate the method and will vary by site, council and timing.
An eight-townhouse project in a middle-ring suburb. Gross realisation is $9.6m (eight sales at $1.2m). Costs:
- Land $2.0m, funded by a loan for the first 6 months.
- Construction $4.6m and soft costs $0.9m.
- Selling costs of 2.5% of gross realisation, which is $240,000.
- A construction facility of $5.0m averaging 55% drawn over 18 months. The remaining build cost is equity. The example ignores how the land loan is repaid when construction starts.
Interest base. Land: $2,000,000 × 0.5 years = $1,000,000 of balance-years. Construction: $5,000,000 × 55% × 1.5 years = $4,125,000 of balance-years. Total: $5,125,000 balance-years.
Interest at each rate is balance-years times the rate:
- At 8.10%: $5,125,000 × 8.10% = $415,125.
- At 8.60% (plus 50 basis points): $5,125,000 × 8.60% = $440,750.
- At 9.10% (plus 100 basis points): $5,125,000 × 9.10% = $466,375.
Each 50 basis points adds $25,625. A full 100 adds $51,250.
Profit at each rate. Costs before finance are $2.0m + $4.6m + $0.9m + $0.24m = $7.74m.
- At 8.10%: $9,600,000 minus $7,740,000 minus $415,125 = $1,444,875. That is 17.7% on cost and 15.1% on gross realisation.
- At 8.60%: profit is $1,419,250, or 17.3% on cost and 14.8% on gross realisation.
- At 9.10%: profit is $1,393,625, or 17.0% on cost and 14.5% on gross realisation.
A rise of 100 basis points takes about 0.5 points off the margin on gross realisation and 0.7 points off the margin on cost. Whether the result clears your lender's minimum is a question for your term sheet.
Then stress the other inputs
In this example, rate is not the input with the largest effect. A 1% fall in sale prices removes $96,000 from gross realisation. That equals the extra interest from a rise of about 187 basis points ($96,000 ÷ $5,125,000 = 1.87%).
So run a grid, not a single line. Put the rate steps across the top and sale price changes down the side: 0%, minus 3% and minus 5%. Add a second grid with build cost up 5%.
Why sale prices belong in a rate test
Rates reach sale prices through buyers. The RBA's October 2026 Financial Stability Review says housing prices have declined in recent months as housing market sentiment has weakened, reflecting the somewhat restrictive stance of monetary policy and changes to negative gearing and capital gains tax discount policies. It also reports that the APRA serviceability buffer was raised from 2.5 to 3 percentage points in late 2021, so loans written recently have been tested well above actual rates.
The same review gives an example of a very adverse downturn, possibly originating overseas, with unemployment at 6.3%, inflation at 7% and the cash rate at 5.6%. That is 100 basis points above the current target. The RBA uses it to test mortgage borrowers and does not forecast it. A developer can use the same level as a stress input.
Choose the stop line
A sensitivity test needs a decision rule written before you read the result.
- Set the minimum margin you will proceed at, on cost or on gross realisation, whichever your lender uses.
- Find the rate at which the project hits that minimum with sale prices flat.
- Find the sale price fall at which it hits that minimum with the rate unchanged.
- Compare the two. The smaller buffer is your real exposure.
Record both numbers in the file. Reread them when the Board decides on 3 November, and again before each drawdown.
What to check
Confirm what rate basis your facility uses. Some pricing moves with a reference rate. Some is set by the lender and reviewed. Ask how and when a change is notified.
Check whether any interest is capitalised. If it is, the interest base grows each month and the figures above understate the cost.
SiteLogic's public Vic development conditions panel sets the cash rate and other signals against a year earlier, which helps place your assumptions against the market.
This article is general information and not financial advice.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Fact-checked: 3 October 2026 · Review by: 3 January 2027
Sources: rba.gov.au · rba.gov.au · rba.gov.au · rba.gov.au
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.