Back to Journal
Refinancing at 4.60%: comparison rates, discharge costs and when switching paysPhoto: SiteLogic editorial image

Refinancing

Refinancing at 4.60%: comparison rates, discharge costs and when switching pays

After four rises in 2026, a lower rate elsewhere is worth checking. This article shows how to compare loans, which switching costs to count, how to find the break-even point, and why a longer term can undo the saving.

·Written and fact-checked . Published .·5 min read

The cash rate has risen four times in 2026. The RBA's housing lending rates table shows the average outstanding owner-occupier variable rate moving from 5.5% in January to 6.2% in July 2026. A borrower who has not compared lenders recently may be paying more than they need to. Whether switching pays depends on arithmetic that takes ten minutes to do.

What the official guidance says

Moneysmart's guide to switching home loans, last updated on 29 July 2026, says variable home loan rates on the market can differ by more than 2 percentage points. It notes that the cash rate is not the only input. A lender also prices on your credit worthiness, your value as a customer and what competitors offer.

Moneysmart suggests a sequence:

  • Ask your current lender for a better deal. If you have at least 20% equity and a good credit score, you have more to bargain with.
  • Check lender's mortgage insurance. With less than 20% equity, you might pay it again on a new loan, and that can outweigh the saving.
  • Count the fees. Moneysmart lists a break fee on a fixed rate loan, a discharge or termination fee when you close the old loan, an application fee on the new loan, a switching fee for an internal refinance, and possibly stamp duty.
  • Check the length of the new loan. Moneysmart warns that a longer term means more interest.

Comparison rates

Moneysmart's glossary defines a comparison rate as a rate that helps you work out the true cost of a loan. It includes the interest rate and most fees and charges, reduced to a single percentage. It is a screening tool. Moneysmart says it covers most fees, which means some are left out. Ask each lender which fees it excludes and what loan size and term it assumes, then add your own discharge and break costs.

Worked example: the break-even point

The following figures are illustrative. They demonstrate the method and will vary by site, council and timing.

A borrower owes $600,000 with 25 years left, on principal and interest repayments. The current rate is 6.65%. A competitor offers 6.15%. Both rates are assumptions.

  • Repayment at 6.65%: about $4,108 a month.
  • Repayment at 6.15%: about $3,921 a month.
  • Monthly saving: about $187, or $2,240 a year.

Now count the costs. Assume a $350 discharge fee and a $600 application fee, a total of $950.

  • Break-even: $950 ÷ $187 = about 5 months.

Add a $4,000 break fee for leaving a fixed rate early.

  • Total costs: $4,950.
  • Break-even: $4,950 ÷ $187 = about 27 months.

The lower rate still pays if the borrower stays, but the horizon changes. On these figures, with the $4,000 break fee, a borrower who sells within two years would not recover the cost of switching.

The term trap

Suppose the borrower takes the new loan over 30 years to cut the repayment.

  • Repayment at 6.15% over 30 years: about $3,655 a month, which is $452 less than today.
  • Total interest on the existing path (25 years at 6.65%): about $632,000.
  • Total interest at 6.15% over 25 years: about $576,000.
  • Total interest at 6.15% over 30 years: about $716,000.

The 30-year loan feels cheaper each month and costs about $84,000 more in interest than staying put. Moneysmart's advice is to negotiate a loan with a similar length to your current one. Some loans allow extra repayments without a fee, in which case a borrower on a 30-year term can pay the 25-year amount. Check the loan terms first.

The lender's test

A switch is a new loan application. The RBA's October Financial Stability Review notes that lenders may apply an exemption from serviceability requirements in certain circumstances, such as like-for-like refinancing. It also records that in late 2023 many exemptions went to borrowers who wanted to refinance but no longer passed a stricter assessment after successive rate rises. That was the RBA's information from liaison with lenders at that time. The review says the share of new lending issued with exemptions rose only slightly over the first half of 2026. The exemption framework it describes applies to banks. With four rises since February, ask a prospective lender at the outset whether a like-for-like refinance would be assessed under that exemption.

Where developers feel it

Refinancing affects buyers and developers in different ways. A presale buyer whose finance approval lapses before settlement has to qualify again at the rate that applies then. A developer refinancing a land loan or a construction facility has the same fee categories as a home borrower, usually at a larger scale, and a lender may want a fresh valuation. The cash rate table shows 4.60% as of 30 September.

What to check

  • The rate on the new loan. Compare it with your current rate and ask for a written offer.
  • Every fee. Use the list above, then add valuation and legal costs.
  • Equity. If it is under 20%, find out whether mortgage insurance applies again.
  • Term. Match the remaining term unless you have a clear reason to change it.
  • Your horizon. Divide the total cost by the monthly saving and compare the result with how long you expect to hold.

This is general information and not financial advice.


Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.

Fact-checked: 3 October 2026 · Review by: 3 January 2027

Sources: moneysmart.gov.au · moneysmart.gov.au · rba.gov.au · rba.gov.au · rba.gov.au

Our standards·

Share this article

Get new articles by email

Weekly digest of new articles. No spam. Unsubscribe any time.

Was this useful? Try the tool this post is based on:

Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.

See Pro pricingFree tier stays free.