Progress payment stages and the deposit cap under the DBCA

How the statutory deposit cap and staged progress payments under the Domestic Building Contracts Act interact with a construction finance drawdown.

·Written and fact-checked . Published .·6 min read

A construction contract is a cashflow instrument as much as it is a legal one, and the way it releases money to the builder is governed by the Domestic Building Contracts Act 1995, not by whatever payment terms a builder proposes. The Act constrains how much a builder can collect before work starts, through a deposit cap, and it ties the rest of the price to progress through the works rather than allowing the builder to draw funds ahead of physical completion. For a developer running a townhouse project on a construction facility, understanding how that statutory structure interacts with the bank's own drawdown process is as important as understanding the headline contract price.

What applies

The deposit cap limits the proportion of the contract price a builder can require before building work commences, and the current cap depends on the value and type of contract, so it should always be confirmed at Consumer Affairs Victoria's building and renovating guidance rather than assumed from memory or from a previous project. Beyond the deposit, the Act requires the remainder of the price to be claimed against defined stages of the work, with the contract itself stating what can be claimed at each stage rather than leaving the timing of payment to the builder's discretion.

The purpose of that structure is straightforward. It stops an owner, or a developer paying on an owner's behalf, from prepaying for work that has not yet been done, and it stops a builder from using an early client's money to fund a later or unrelated project. On a well-run job the effect is invisible. On a job where the builder is under financial pressure, the staged structure is one of the few protections a paying party has before things become visible in other ways.

The staged model in practice

Contracts for house and townhouse construction commonly structure the staged payment schedule around a recognisable sequence: a base or slab stage, a frame stage, a lock-up stage, a fixing stage, and practical completion. The exact stage names and the amount claimable at each stage are set out in the individual contract, consistent with the requirements of the Act, and they should be read on the face of the document rather than assumed to follow a standard industry pattern by default.

The practical point for a developer is that these stages describe physical progress, not calendar time. A stage payment becomes claimable once the relevant work is actually complete, which means the schedule is only as reliable as the inspection process behind it. A stage claimed before it is genuinely finished is the single most common source of dispute in this part of a building contract.

How to model it

The staged payment schedule in the building contract and the drawdown schedule in a construction finance facility are not automatically the same document, even though they describe the same physical building. A financier typically requires its own independent quantity surveyor to certify progress before releasing funds, against a drawdown schedule the bank has set, and that schedule's stage definitions and timing do not always line up precisely with the builder's contractual stages.

That mismatch is where cashflow risk actually lives on a leveraged project. If the builder's contract entitles it to claim a stage payment before the financier's QS has certified the equivalent point in the drawdown schedule, the developer needs to bridge the gap from its own funds or negotiate timing with the builder. The deposit cap compounds this at the front end of the project, because it limits how much working capital the builder can draw before site works begin, which means early costs such as site establishment, long-lead material orders and initial trade mobilisation are often funded by the builder's own capital or supplier trade terms rather than the client's money. Builders who are thinly capitalised tend to price that funding cost into the head contract, whether through the price itself or through more aggressive early-stage claims.

The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. On a townhouse project with a contract price split across five stages, a developer might see the builder submit a lock-up stage claim two weeks before the financier's QS report is scheduled, creating a short funding gap that has to be covered from the developer's own account or negotiated as a delayed claim. Modelling that gap as a standing cashflow line, rather than assuming the contract schedule and the bank schedule move in lockstep, avoids a working capital surprise mid-build.

What to check before exchange

Confirm the contract states its stage definitions and the amount claimable at each stage clearly on its face, rather than deferring to a schedule attached later or left blank at signing. Confirm the deposit does not exceed the cap that currently applies to a contract of this value and type, checked directly against the current Consumer Affairs Victoria guidance rather than a prior project's figure. Compare the contract's stage definitions and expected timing against the financier's drawdown schedule before signing either document, and flag any mismatch to both the builder and the bank rather than discovering it mid-construction.

Interaction with other controls and record keeping

The staged payment structure also interacts with domestic building insurance, since a stage paid for work that was not actually complete increases the exposure carried if the builder later becomes unable to finish the job. Keep the inspection report, the progress claim and the payment record for every stage in one file, because a dispute late in the project, or a claim under domestic building insurance, will usually turn on whether the paid stages were genuinely complete at the time of payment rather than on the headline contract price.

Treat the deposit cap and the staged payment structure as the mechanism that actually governs cashflow on a construction project, and read it alongside the financier's own drawdown terms before assuming the two move together.

This is worth revisiting whenever a facility is refinanced or a builder is changed mid-project, since a new financier's QS process or a replacement builder's stage definitions can shift the timing assumptions the original feasibility was built on. A cashflow model that was accurate at contract signing can fall out of step with reality well before practical completion if the stage schedule is not re-checked against the current drawdown terms at each material change to the financing or construction arrangement.


Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.

Fact-checked: 19 July 2026 · Review by: 19 July 2027

Sources: legislation.vic.gov.au · consumer.vic.gov.au

Our standards·

Share this article

Get new articles by email

Weekly digest of new articles. No spam. Unsubscribe any time.

Was this useful? Try the tool this post is based on:

Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.

See Pro pricingFree tier stays free.