Photo: SiteLogic editorial imageInterest Rates
Private credit and mezzanine finance: what capital costs when banks tighten
The RBA's October 2026 Financial Stability Review reports tighter private credit conditions and more sensitivity to project risk. This article prices a mezzanine layer against a lower senior bank limit.
A senior lender trims its loan-to-cost ratio from 70% to 60%. The ten points do not disappear from the capital stack. Someone has to fund them, and that someone charges more than the bank.
On many Victorian medium-density projects the gap is filled by mezzanine finance from a non-bank lender, often a private credit fund. When banks tighten, the cost of that layer is the number that decides whether a marginal site still works.
What the RBA reports about private credit
The RBA's October 2026 Financial Stability Review says liaison with private credit funds points to some tightening of financial conditions and more sensitivity to project risk. It adds that this may affect funding access for businesses that rely on these lenders, including some residential property developers.
The review also records the administration of one large builder and developer. Its chapter on the financial system refers to the recent insolvency of a larger property developer, which appears to be the same event. It says a large number of funds were exposed, that this led to more redemption requests and tighter funding for some Australian funds, and that liaison suggests most loans still perform and are well collateralised.
Scale matters. On the largest available estimates the RBA puts private credit at around 10% of total business debt and under 2% of financial system assets. It describes Australian private credit funds as typically concentrated in real estate lending, including construction and development. A fund with that concentration feels a property downturn directly. The RBA says private credit does not pose a system-wide financial stability risk at present, that opaque practices at some funds can expose individual investors to unknown risks, and that Australian banks' exposures are small.
Why a fund prices differently from a bank
Moneysmart explains that private credit funds pool investor money and lend it on, with returns coming from interest and fees less fund costs. It warns that withdrawals may be restricted or delayed and that loans are valued by models and judgement, not by a public market.
For a developer, the practical consequence is that a fund's price reflects its own funding position. If investors want money back, a fund may have less to lend and may charge more for the loans it does write. The cash rate is one input. The RBA's explainer on transmission notes that the spread between the cash rate and other interest rates varies with the risk attached to different loans. Mezzanine sits behind the senior lender and ahead of equity, so it usually carries the widest spread of any debt in the stack.
A worked example
The following figures are illustrative. They demonstrate the method and will vary by site, council and timing.
Take a project with $10.0m of total development cost over 18 months and $3.0m of equity in every case. Senior interest is priced at 8.10%, the SiteLogic default holding rate (cash rate plus a 3.5 point lender margin). The senior loan averages 55% drawn over the programme.
Case A: the bank lends 70%, or $7.0m. Interest is $7,000,000 × 55% × 8.10% × 1.5 years = $467,775.
Case B: the bank lends 60%, or $6.0m, and mezzanine fills $1.0m. Senior interest is $6,000,000 × 55% × 8.10% × 1.5 = $400,950. Mezzanine at 14%, drawn early and held for the full 18 months, costs $1,000,000 × 14% × 1.5 = $210,000. A 2% establishment fee adds $20,000. Finance cost is $400,950 + $210,000 + $20,000 = $630,950.
Case B costs $163,175 more than Case A. That is 1.6% of total cost. Put another way, the extra $1.0m costs about 10.9% a year after allowing for the senior interest you no longer pay ($163,175 ÷ $1,000,000 ÷ 1.5).
Compare it with a rate move. A 25 basis point rise on the senior loan adds $6,000,000 × 55% × 0.25% × 1.5 = $12,375. The mezzanine layer costs about 13 times that ($163,175 ÷ $12,375). A developer watching only the cash rate is watching the smaller number.
The mezzanine draws early in this example and the senior average stays at 55%. That is a simplification. Your drawdown schedule will move the totals, so build the real one.
What to ask before accepting a term sheet
Price is the first question and rarely the last.
- The lender's own funding. Ask whether the fund holds committed capital for your drawdowns, and what its redemption terms are. A fund under redemption pressure can slow or stop advances.
- Drawdown conditions. Check what must be true before each draw, including valuation and cost-to-complete tests.
- Fees beyond the headline. Look for extension, exit and default interest charges and whether interest capitalises.
- Ranking and consent. Confirm how the mezzanine security ranks against the senior lender and what the senior lender must approve. Get both lenders' terms in writing before exchange.
- Valuation practice. The FSR records that ASIC issued a statement in June 2026 calling on private credit funds to keep valuations timely and robust. A lender that revalues your security mid-project can change your headroom.
ASIC published a report on private credit in Australia in September 2025 (REP 814), prepared for it by Richard Timbs and Nigel Williams. It predates the events above but sets out how the sector works.
Where it goes in the feasibility
Model mezzanine as its own line with its own rate, fee and draw profile. Do not blend it into one debt rate. Then run the project with no mezzanine available, to see whether it survives a senior lender who stays at 60%.
The RBA says lending competition for businesses remains strong across banks and non-banks, though some non-bank lenders have recently reported a moderation, particularly for higher-risk projects. A site that only works with a cheap top-up layer is a site that depends on one lender's appetite.
This article is general information and not financial advice.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Fact-checked: 3 October 2026 · Review by: 3 January 2027
Sources: rba.gov.au · rba.gov.au · moneysmart.gov.au · asic.gov.au · rba.gov.au
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.