Presale coverage and construction finance in Victoria
Why lenders set a presale coverage condition before releasing construction finance for a Victorian medium-density project, and how buyer capacity feeds conversion.
What applies
A construction loan for a Victorian townhouse or apartment project is rarely released on the strength of the development application and a fixed-price building contract alone. Before an authorised deposit-taking institution funds the build, it typically wants evidence that a portion of the stock is already sold. That evidence takes the form of a presale coverage condition, expressed as a ratio of contracted sales value (or unit count) to either total debt or total end value. The lender sets the threshold in the facility agreement, and it becomes a condition precedent to the first drawdown.
The mechanism exists because construction lending is repaid from two possible sources: settlement proceeds from buyers, or refinance once the project is complete and holding value. A presale book gives the lender a line of sight to the first of those repayment sources before it commits capital to the second. The lender's own funding cost and balance-sheet settings shape how strict that condition is, and those settings sit with the prudential regulator rather than with any single bank. The list of institutions actually authorised to take deposits and lend on this basis is maintained by APRA, and it is worth checking that your proposed financier appears on it before you build a feasibility around their indicative terms; see the APRA authorised deposit-taking institutions register.
The coverage condition is not static across the cycle. A lender's appetite for presale risk moves with the flow of housing finance more broadly, and it moves faster than any single project's approval timeline. Aggregate lending flows, commitment volumes and the mix between owner-occupier and investor lending are published regularly and give a reasonable proxy for how comfortable the lending market is with forward commitments generally. Check the current release before you assume a coverage ratio that applied on a comparable project six or twelve months ago will still be on offer; see the ABS Lending Indicators.
How to model it
Treat presale coverage as a gating variable in the feasibility, not a footnote. The practical sequence is:
- Establish the likely construction debt quantum from your cost plan and the lender's expected loan-to-cost or loan-to-value ratio.
- Ask prospective financiers, or your finance broker, for an indicative coverage requirement expressed against that debt quantum or against total end value. Do not assume it is uniform across the market; it varies by lender, by dwelling typology and by the project's location risk.
- Translate the coverage ratio into a required number of presale contracts, given your indicative price schedule.
- Model the sales campaign duration needed to reach that contract count, using a conversion assumption drawn from enquiry-to-contract data on comparable local campaigns, not from a generic industry rule of thumb.
- Build the drawdown schedule around the date the coverage condition is expected to be satisfied, not around the date construction is notionally ready to start. A gap between those two dates is a holding-cost risk that belongs in the feasibility as an explicit line, not an assumption buried in the contingency.
The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. A twelve-townhouse project with a $9.6 million construction cost and a lender requiring 60 per cent presale coverage against total debt of, say, $7.2 million would need contracts covering roughly $4.3 million of that figure before drawdown. At an average contract price of $720,000 that is six contracts. If the sales agent's historical conversion on comparable stock in the catchment runs at roughly one contract per four qualified inspections per month, the model would carry a presale period of several months before the construction drawdown date, and that period carries its own holding cost, marketing cost and the risk that the price schedule needs revising if early feedback is soft.
Interaction with rate settings and the cycle
Presale coverage is not decided in isolation. It sits downstream of the same monetary settings that determine both the lender's cost of funds and the buyer's borrowing capacity. When benchmark interest rates move, two things happen at once: the developer's own facility repricing risk shifts, and every prospective purchaser's serviceability and maximum loan size shifts with it. A coverage ratio that looked achievable when buyer borrowing capacity was higher can become harder to satisfy if rates rise during the presale campaign, because the same nominal price now represents a larger repayment burden for the buyer pool you are marketing to. This is one of the reasons a sensitivity run on the feasibility should flex the presale conversion assumption alongside cost and price, not treat it as fixed.
It also means the presale campaign should not be planned purely off list price. If the buyer pool's capacity is compressing, the conversion rate needed to hit coverage in the assumed timeframe may require either a longer campaign, a price adjustment, or both. Building that flexibility into the model before launch is materially cheaper than discovering it mid-campaign with a construction contract already signed.
What to check before exchange
Before signing a building contract or exchanging on a site with a presale-dependent capital structure, confirm:
- The exact coverage ratio and the base it is measured against (debt, end value or unit count) in the indicative or executed term sheet, not a verbal indication.
- Whether the condition is measured on gross contract value or net of GST and selling costs, since this changes the number of contracts required.
- Whether off-the-plan contracts with sunset clauses or finance conditions attached count towards coverage, or only unconditional contracts.
- The lender's authorisation status and current lending posture, cross-checked against the APRA register, particularly if you are dealing with a second-tier or non-bank financier.
- The most recent aggregate lending data for the housing finance segment relevant to your buyer pool, so the presale campaign timeline assumption is grounded in the current environment rather than a prior cycle; see the ABS release.
- The consequence of falling short of coverage by the drawdown date: whether the facility allows a partial drawdown, an extension, or whether it is a hard stop that pushes the project into standstill.
Record keeping and review
Keep a dated log of every coverage indication received from every lender approached, along with the source data used to justify the presale conversion assumption at the time the model was built. When conditions shift, and they will, a documented trail lets you show a financier or an equity partner exactly what assumption changed and why, rather than defending a stale number. Lachlan Voss describes this discipline in more detail in his book, The Victorian Property Developer, where the presale-to-drawdown chain is treated as one of the most consequential risk points in a medium-density capital structure. Review the coverage assumption at each major feasibility checkpoint, including financial close.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.