Photo: SiteLogic editorial imageInflation
Inflation explained: headline, trimmed mean and the 2 to 3% target band
The RBA targets inflation of 2 to 3% but watches several measures. This article explains headline CPI, trimmed mean and the target, shows where the latest ABS figures sit, and runs the arithmetic for a Victorian contract with an indexation clause.
Every rate decision starts from an inflation reading. The number quoted in the news is usually headline CPI. The number the Reserve Bank leans on is often trimmed mean. They can differ by half a percentage point, and the gap matters for a developer reading the next release.
The target
The RBA's Statement on the Conduct of Monetary Policy records the agreement with the Government. It adopts a flexible inflation target, with an appropriate goal of consumer price inflation between 2 and 3 per cent. The Monetary Policy Board sets policy so that inflation is expected to return to the midpoint of the target. The statement says all outcomes within the range are consistent with price stability, and that the timeframe for returning to the midpoint depends on economic circumstances.
The midpoint is 2.5%. A reading above 3% sits outside the band.
Headline CPI
Headline CPI measures the price change of the full basket of goods and services households buy. The ABS Consumer Price Index for August 2026, released on 30 September, reported:
- CPI rose 4.0% in the 12 months to August 2026, up from 3.5% in the 12 months to July.
- In the month of August, CPI rose 0.4% in original terms and 0.7% seasonally adjusted.
- Among the contributors to the annual rise, new dwellings rose 5.4%, electricity 13.2% and rents 3.6%.
The ABS attributed the electricity rise largely to the end of Commonwealth electricity rebates. Single items like that can move the headline without telling you much about broad price pressure.
Monthly changes are also volatile. The ABS table shows monthly movements of 1.1% in March 2026, minus 0.7% in May and 1.0% in July. A single month tells you little. The annual rate smooths it.
Trimmed mean
Trimmed mean is an underlying measure. An RBA Bulletin article on measures of underlying inflation explains the method. The trimmed-mean rate is the average rate of inflation after trimming away a share of the price changes at both ends of the distribution. That 2010 article describes the 15 per cent trimmed mean, which trims away the 15 per cent of items with the smallest price changes and the 15 per cent with the largest. It is the measure the ABS publishes as trimmed mean. The rationale is that very large moves in a few items can distort an ordinary average and may not reflect broader pressure.
The ABS reported trimmed mean inflation of 3.6% in the 12 months to August 2026, unchanged from July. The ABS release also flags methodology changes since October 2025 and publishes a quarterly trimmed mean on the earlier basis, so check which version a commentator quotes.
The RBA's August Statement on Monetary Policy projected that underlying inflation would stay above 3 per cent until mid-2027 and then ease to 2.5 per cent by early 2028. Those forecasts were finalised on 5 August, before the 29 September decision. They are projections, and they carry the risks the RBA lists.
What the gap says
Headline CPI was 4.0% and trimmed mean was 3.6%, a gap of 0.4 percentage points. Both are above the target band.
The cash rate is 4.60%. One rough check, which is SiteLogic's arithmetic and not an RBA measure, is the cash rate less each inflation rate.
- Cash rate less trimmed mean: 4.60% − 3.6% = 1.0 percentage point.
- Cash rate less headline CPI: 4.60% − 4.0% = 0.6 percentage points.
The RBA's October Financial Stability Review describes the stance of policy as somewhat restrictive.
The 29 September statement said the Board judged that a further tightening in financial conditions was warranted, because inflation was still too high. A rise in the headline could also be driven by fuel and energy, which the statement links to the Middle East conflict.
Worked example: an indexation clause
The following figures are illustrative. They demonstrate the method and will vary by site, council and timing.
A Victorian developer signs a construction contract in which $500,000 of the price is indexed annually to CPI.
- At 4.0% indexation: $500,000 × 0.04 = $20,000.
- At 2.5%, the target midpoint: $500,000 × 0.025 = $12,500.
- Difference: $7,500 in one year.
Set that beside the holding loan. SiteLogic's default rate of 8.10% less 4.0% headline CPI is 4.1 percentage points in real terms. Inflation lifts the indexed contract price. It can also keep upward pressure on the cash rate behind that 8.10%.
What the 28 October release is for
The ABS calendar lists the September 2026 Consumer Price Index for 28 October. Because September ends a quarter, that release also carries the quarterly figures. Release dates can change. This article was written on 3 October and says nothing about the result. When it arrives, compare the annual headline and trimmed mean with 4.0% and 3.6%. A lower number does not guarantee a lower cash rate, because the Board also weighs the labour market and its own forecasts.
What to check
- The index in your contract. Confirm whether a clause refers to national CPI or to a Melbourne series, and which month it uses.
- The measure in the headline. When a report quotes inflation, check if it is headline or trimmed mean.
- Annual rates. Use the 12-month rate for planning, because single months are volatile.
- Your sensitivity. Run the escalation line at 2.5%, 3.5% and 4.5%.
- The cash rate. The Vic development conditions panel shows the cash rate against a year ago.
This is general information and not financial advice.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Fact-checked: 3 October 2026 · Review by: 3 January 2027
Sources: rba.gov.au · abs.gov.au · rba.gov.au · rba.gov.au · rba.gov.au · abs.gov.au · rba.gov.au
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.