Back to Journal
Fixtures and duty: when plant and equipment are dutiablePhoto: SiteLogic editorial image

Tax

Fixtures and duty: when plant and equipment are dutiable

How the fixtures provisions can draw plant and equipment into the dutiable value of a land transfer, and what to check before settlement.

·Written and fact-checked . Published .·6 min read

What applies

Land transfer duty in Victoria is assessed on the dutiable value of the land, and dutiable value is not limited to what a contract labels as "the land." Under the Duties Act 2000, fixtures, items that have become part of the land by the way they are affixed and used, form part of the dutiable property even where a contract tries to carve them out as separate chattels. The SRO's guidance on fixtures sets out the tests it applies and the current administrative approach to valuing and apportioning fixtures within a transaction.

This matters most on sites bought with existing improvements: a former factory, a warehouse with racking and plant, a service station, a childcare centre with fitted equipment, or any site where the vendor's business assets sit on or in the building being transferred. Developers who plan to demolish the improvements sometimes assume none of that plant matters for duty because it will not survive to completion. The fixtures test does not care about future intentions. It asks whether the item was, at the time of the dutiable transaction, a fixture at law, and if so its value is part of what duty is calculated on regardless of what happens to it afterwards.

The fixtures test

Whether an item is a fixture rather than a chattel turns on established property-law tests, principally the degree and purpose of annexation, how firmly the item is attached to the land or building, and why it was installed. Items bolted to a concrete slab and integrated into the building's services, plant fitted for the specific purpose the building was designed around, and built-in equipment generally sit on the fixture side of the line. Free-standing equipment that can be removed without damage to the structure and was not installed to serve the land permanently is more likely to remain a chattel, sold separately from the dutiable land transaction.

The SRO's approach and the case law it draws on set the tests, and they are genuinely fact-specific: the same category of item can be found either a fixture or a chattel depending on how it was fitted and used at the particular property. A contract clause declaring an item a "chattel" does not settle the question if the physical facts point the other way, which is why a fixtures assessment needs to look at what is actually installed on site, not just what the special conditions call it.

How it affects dutiable value

Where a transaction includes fixtures, their value is included in the dutiable value of the land, and this is separate from any value attributed to genuine chattels, which are not dutiable. Contracts for sites with substantial plant, fit-out or equipment often apportion the price between land (including fixtures) and chattels, and the SRO can review that apportionment against its own assessment of what is properly a fixture. An apportionment that shifts value onto a "chattels" schedule to reduce dutiable value, without a genuine basis in the fixtures test, is the kind of position the SRO is set up to challenge.

For a developer, the practical exposure is usually an incomplete fixtures assessment at contract stage rather than deliberate under-declaration: plant that should have been valued as part of the dutiable land was left out of the calculation because nobody walked the site with the fixtures test in mind before signing.

Interaction with other transaction costs

The fixtures question can also interact with GST treatment and with any going-concern or margin scheme position on the same sale, since those regimes look at what is being supplied in a related but distinct way to how duty looks at what is dutiable land. A site bought as a going concern with plant included, for instance, still needs its own fixtures analysis for duty purposes even where the GST position is settled separately. Do not assume that resolving one tax treatment resolves the other. Each requires its own assessment against its own tests, and a competent adviser will run them side by side rather than assuming one outcome carries across.

How to model it

Do not assume a stated chattels value in a contract of sale is the final duty position. Where a site includes meaningful plant, equipment or fit-out, get a fixtures assessment done before you rely on the contract's apportionment in a feasibility, ideally by the same adviser who will lodge the duty return, so the assessed dutiable value and the feasibility number are the same figure. Confirm the current duty rate and any relevant thresholds on the SRO's site and general duty pages before finalising the calculation, since rates and any concessions can change.

The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. Say a contract for an industrial site states a total price of $5,000,000, apportioned as $4,600,000 for land and improvements and $400,000 for chattels, being process plant the vendor says is free-standing. If a fixtures review finds that $250,000 of that plant is properly a fixture, being integrated into the building's structure and services, the dutiable value rises from $4,600,000 to $4,850,000, and duty is payable on the higher figure. That $250,000 shift is exactly the kind of gap a pre-contract fixtures walk-through is meant to catch before it becomes a post-settlement dispute with the SRO.

What to check before exchange

Before exchanging on a site with existing plant, equipment or substantial fit-out, arrange a fixtures assessment as part of due diligence, not as an afterthought once the contract has been apportioned by the vendor's side. Ask for an itemised schedule of everything on site that might be a fixture or a chattel, and have your adviser test the apportionment in the draft contract against the fixtures criteria before you sign, rather than after settlement when the SRO's own review might land.

Where the site will be demolished shortly after settlement, resist the temptation to treat that as a reason to discount the fixtures analysis. The duty liability is assessed on the position at settlement, not on the post-demolition state of the site.

Record keeping and review

Keep the fixtures assessment, the itemised chattels schedule, and the basis for any apportionment in the transaction file, because these are exactly what the SRO will ask for if it reviews the dutiable value declared on a transfer. Fixtures determinations are fact-specific, and a borderline item that could reasonably be argued either way should be put to a duties specialist rather than resolved by assumption. Revisit any apportionment methodology periodically against current SRO guidance, since the administrative approach to specific categories of plant can be updated over time.


Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.

Fact-checked: 19 July 2026 · Review by: 19 July 2027

Sources: legislation.vic.gov.au · sro.vic.gov.au

Our standards·

Share this article

Get new articles by email

Weekly digest of new articles. No spam. Unsubscribe any time.

Was this useful? Try the tool this post is based on:

Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.

See Pro pricingFree tier stays free.