ESVF 2026–27: the vacant-land holding-cost reset developers should model
Victoria's 2026–27 emergency services levy rates apply by property classification and capital improved value. Vacant land no longer has its own category, so classification is now a live feasibility input.
Vacant land does not have a separate emergency-services levy category in Victoria anymore. For 2026–27, a developer has to model the Emergency Services and Volunteers Fund contribution from the property's broader classification and capital improved value. That sounds like a rates-notice detail. On a land bank, staged subdivision or mixed-use holding, it is a classification and cash-flow question.
The main mistake is to carry forward an old "vacant land levy" allowance as a flat amount. The State Revenue Office's current method is fixed charge plus a variable charge, applied to each property and driven by the classification shown on the council rates notice.
What applies from 1 July 2026
The SRO's current rates table sets the 2026–27 fixed charge at $139 for residential property, including vacant residential land, and $282 for non-residential property.
The variable rate is expressed in cents per $1,000 of capital improved value. For 2026–27 the table records 17.3 cents for residential land, 133 cents for commercial land, 133 cents for industrial land, 28.7 cents for primary-production land and 5.7 cents for public-benefit land.
The arithmetic is simple. The commercial judgement is not. The SRO calculation guidance says the contribution is the fixed charge plus the applicable variable rate multiplied by capital improved value, less any eligible concession, rebate or exemption.
It also says the classification is based on the Australian Valuation Property Classification Code allocated to the property through the valuation process. From 1 July 2025, the separate vacant-land category was removed and vacant properties were allocated to residential or non-residential classifications according to use.
Why classification matters to a development site
A vacant residential parcel and a vacant commercial or industrial parcel can carry very different variable rates even when their capital improved values are similar. The label in an acquisition memorandum is not what determines the charge. The classification on the assessment does.
That matters where a project includes several titles, temporary uses or a future change in use. A feasibility should not assume that every title inside one development boundary has the same ESVF treatment. The SRO says the contribution is payable on each property owned, which means separate titles can also carry separate fixed charges.
For a staged subdivision, the holding-cost schedule should be reviewed as titles are created, sold or reclassified. The same gross land parcel can produce a different assessment profile after subdivision even though the development concept has not changed.
Do not mix ESVF with other holding costs
ESVF is not council general rates, land tax or vacant residential land tax. Each uses its own legal base, valuation input and exemptions. Putting them into one percentage allowance makes it difficult to see which assumption moved.
The SRO says ESVF uses capital improved value. Its land-tax valuation guidance says ordinary land tax uses site value. Its vacant residential land tax guidance says that separate tax uses capital improved value and tests vacancy or, from 2026, certain long-term undeveloped metropolitan residential land.
A workable development model gives each charge its own row. That lets the modeller change classification, value and ownership period without overwriting the assumptions for the other taxes and council charges.
How to model 2026–27
Start with the current rates notice for every title. Record the property classification, capital improved value and fixed-charge treatment. If the land is being acquired part-way through the financial year, the contract and settlement adjustment provisions determine the commercial allocation between vendor and purchaser. The statutory assessment itself does not replace that contract review.
Apply the SRO's published formula and keep the rate input linked to the financial year. The SRO's 1 July summary confirms the 2026–27 fixed charges and provides a clean annual checkpoint for the model.
For a multi-year hold, do not freeze the 2026–27 amount. The fixed and variable rates are set for a financial year, while capital improved values and property classifications can also change. Use an annual review point rather than inventing a long-run statutory escalation rate.
Then test the land's intended use against its assessed classification. If the investment case assumes residential treatment while the notice records a non-residential category, the model should use the assessed position until the classification is formally changed. A future rezoning, permit or master plan does not by itself prove that the ESVF classification has changed.
What to verify before exchange
Obtain the latest rates notice in addition to the vendor's land-tax assessment. Check every title and note any different classifications inside the site.
Reconcile the capital improved value with the valuation date and the due-diligence material. A purchase price is not automatically the CIV used on the current notice. If the valuation or classification appears wrong, the SRO guidance says objections are made through the valuation process; the feasibility should not assume an objection will succeed.
Check whether the project structure will create or consolidate titles. The fixed charge applies per property, so title strategy can change the number of assessments during the hold.
Finally, use the current SRO table as the source of truth. The SRO's July 2026 tax-relief update records a legislative deferral affecting a proposed fixed-charge increase for non-principal-place-of-residence residential land. That is a reminder not to model from an earlier announcement when the current rate page has since been updated.
ESVF is unlikely to decide a project on its own. But the classification gap between residential and non-residential land is large enough that an old vacant-land allowance can be misleading. The reliable method is title by title, year by year, using the assessment and the SRO rate that actually applies.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Fact-checked: 18 July 2026 · Review by: 18 July 2027
Sources: sro.vic.gov.au · sro.vic.gov.au · sro.vic.gov.au · sro.vic.gov.au · sro.vic.gov.au · sro.vic.gov.au
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.