Back to Journal
Economic entitlement: duty on development agreementsPhoto: SiteLogic editorial image

Tax

Economic entitlement: duty on development agreements

How Victoria's economic entitlement provisions can bring a profit-share or development agreement within the duty net even without a transfer of land, and why the structure needs advice before signing.

·Written and fact-checked . Published .·6 min read

What applies

Victorian duty is not confined to a transfer of title. The Duties Act 2000 also reaches arrangements that give a person the economic benefits of land ownership without any formal conveyance, what the Act treats as acquiring an "economic entitlement" in relation to land. Where the provisions are engaged, the person who acquires that entitlement can be assessed for duty as if they had acquired a direct interest in the land itself, even though no certificate of title ever changes hands.

The policy target is straightforward. A landowner and a developer can, in principle, structure a deal so that the developer gets the entire economic outcome of a sale, a share of sale proceeds, a share of profit, a share of increased value, while the landowner keeps legal title until much later, or transfers it directly to end purchasers. Done well, that structure can look nothing like a sale on paper. The economic entitlement provisions exist so this kind of arrangement does not sit permanently outside the duty base just because the parties avoided a registered transfer.

The Duties Act 2000 sets out the detailed tests: what counts as an economic entitlement, which arrangements are caught, and how the notional dutiable value is calculated. The SRO's economic entitlement guidance works through the scenarios and is the primary reference for anyone assessing a specific agreement.

What triggers it

The provisions are aimed squarely at development and profit-share structures: agreements where a developer funds, manages or carries out a development on land owned by someone else, in exchange for a share of the proceeds, the profit, the rental income, or the increase in value, rather than a fee for services. The more the developer's return tracks the underlying performance of the land and looks like an owner's return rather than a contractor's fee, the more likely the arrangement falls within scope.

Common commercial features that raise the question include profit-share development agreements, gross-realisation-share arrangements, some forms of put-and-call option structures layered with management rights, and joint venture deeds where one party takes an economic share without taking a registered interest. This does not mean every development agreement is caught. Many conventional arrangements, including standard project management or construction contracts paid by fee, sit outside the provisions entirely. The dividing line depends on the actual rights and economic substance the agreement creates, not on what the parties call it.

How to model it

The first modelling consequence is timing. Where the economic entitlement provisions apply, duty can be assessed on execution of the agreement that creates the entitlement, not on a later settlement. The duty cost can crystallise at the point the parties sign the development agreement, well before any land changes hands and well before the project has generated any revenue to fund it. A feasibility built on the assumption that duty is a settlement-stage cost, sitting alongside the acquisition, can be wrong about when the cash actually needs to be found.

The second consequence is scale. Because the notional dutiable value is tied to the value of the economic entitlement acquired, which the Act and SRO guidance set out how to calculate, a large profit-share position in a high-value site can generate a duty exposure that has nothing to do with any price paid for an interest in the land, since no price was paid for an interest in the land at all. That is a different exposure to model to the duty on a straightforward purchase, and it needs its own line, assessed against the specific agreement rather than assumed away.

Practically, the structuring conversation has to happen before terms are settled, not after. Once the agreement is signed in a form that falls within the provisions, the duty consequence is already fixed. Reworking the deal afterwards does not undo an assessment that has already crystallised.

What to check before exchange

Before signing any development agreement that gives one party a profit share, a proceeds share, or another form of economic upside without a corresponding transfer of title, get the drafting reviewed against the economic entitlement provisions specifically, in addition to the general commercial terms. Ask whether the structure as drafted creates an economic entitlement, what the assessed value would be if it does, and when duty would be payable relative to the project's cash flow.

It is also worth checking whether the same arrangement could separately engage landholder duty, where the land is held through a company or unit trust rather than directly. The two sets of provisions can overlap, and an arrangement structured to avoid one can still be caught by the other. Confirm the current thresholds, rates and any applicable exemptions directly against the SRO page and the Act before finalising a feasibility, since these settings are reviewed and adjusted periodically.

Where this needs professional advice, not a rule of thumb

Whether a specific agreement creates an economic entitlement is a fact-specific question. It turns on the precise rights the agreement grants, how the return is calculated, who controls decisions about the development, and the practical substance of the arrangement rather than its label. Two development agreements that look similar in a one-page summary can land on opposite sides of the line depending on a handful of clauses.

This is not an area where a general description of the mechanism, of the kind set out above, is a substitute for advice on your actual document. Get a Victorian duty specialist to review the executed form of any profit-share, gross-realisation-share or similar development agreement before signing, and treat any answer as specific to that document, not as a rule that carries over to the next deal. Do not rely on informal precedent about how a similar deal was treated elsewhere. The SRO assesses on the facts of the instrument in front of it, and outcomes vary accordingly.

An illustrative structure

The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. Take a landowner who signs an agreement giving a developer 40% of net sale proceeds from a future subdivision, in exchange for the developer funding and managing the entire project, with the landowner retaining title until individual lots settle to end buyers. If that arrangement is assessed as creating an economic entitlement, duty could be calculated against a notional dutiable value linked to the interest the developer has acquired. Illustratively, if that notional value were assessed at $1,500,000, the resulting duty, at whatever rate applies under the Act at the relevant time, would need to be funded at or near execution of the agreement, not at the eventual settlement of the first lot. Every figure here is a placeholder. The real test, the real valuation method and the real duty payable depend on the specific agreement and must be confirmed with a specialist and the SRO before you rely on any number.


Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.

Fact-checked: 19 July 2026 · Review by: 19 July 2027

Sources: legislation.vic.gov.au · sro.vic.gov.au

Our standards·

Share this article

Get new articles by email

Weekly digest of new articles. No spam. Unsubscribe any time.

Was this useful? Try the tool this post is based on:

Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.

See Pro pricingFree tier stays free.