Structuring the due-diligence period before you commit

A due diligence condition is only real protection if the clause names the checks, sets a workable timeline, and gives the purchaser a genuine right to walk. How to structure one for a Victorian development site.

·Written and fact-checked . Published .·6 min read

A due diligence condition is one of the most negotiated clauses in a Victorian development contract, and one of the most poorly drafted. Purchasers often accept a generic condition lifted from a template, on the assumption that "subject to due diligence" does the job on its own. It does not. A due diligence period only functions as real protection if the clause names what is being checked, sets a timeline the purchaser can actually work to, and gives a genuine, unqualified right to terminate if the checks are not satisfied. Anything short of that is a formality that reads well in a contract but does nothing when a site turns out to carry a problem the purchaser did not see coming.

Why a due diligence condition exists

A contract for the sale of land is, on its face, binding once signed: the purchaser is committed to complete, subject only to whatever conditions the contract itself contains. A due diligence condition exists to give the purchaser time, after exchange but before that commitment becomes irrevocable, to test the assumptions the offer was built on, including planning capacity, title, contamination, services, geotechnical conditions, heritage and easements. The general law governing contracts for the sale of land in Victoria, set out across the Property Law Act 1958, does not itself impose a due diligence right. The whole protection has to be built into the special conditions of the contract, and if the clause is silent, ambiguous or drafted in the vendor's favour, the purchaser has no fallback to rely on.

What the clause actually needs to say

A workable due diligence condition specifies four things: the matters the purchaser may investigate, the standard the purchaser must meet to terminate, the mechanism and deadline for giving notice, and the consequence of silence. On the standard for termination, courts have shown little patience for clauses that give a purchaser an unfettered discretion with no real content, so the condition needs to be framed around genuine, good-faith dissatisfaction with a stated matter rather than an open door to walk away for any reason. Each of these four elements needs to be spelled out in the special conditions rather than assumed. A clause that lets the purchaser terminate "if not satisfied with due diligence" but does not define what due diligence covers, or what happens if the deadline passes without notice either way, invites a dispute at exactly the point the purchaser most needs certainty.

Vendor disclosure and where it stops

Before a Victorian contract is signed at all, the vendor is required to give the purchaser a statement disclosing specified matters about the land, under Section 32 of the Sale of Land Act 1962. That statement is a useful starting point for due diligence, but it is a floor, not a ceiling. A Section 32 statement discloses what the vendor is required by statute to disclose. It does not certify that the site is fit for the purchaser's intended development, and it is silent on matters entirely outside the disclosure regime, such as the practical feasibility of a particular yield, the real capacity of services infrastructure, or council attitude to a specific design outcome. A purchaser who treats the Section 32 statement as a complete risk check is relying on a document built for a narrower purpose than the one they need it to serve.

Timelines that work in practice

A due diligence period needs to be long enough to complete the investigations that actually matter, and short enough that the vendor will agree to it. The two do not always sit comfortably together, and the usual resolution is to prioritise. Title and planning searches, a preliminary feasibility, and a site inspection can typically be completed quickly. A full contamination assessment, a detailed geotechnical investigation, or informal council feedback on a concept design take longer, and may need to run in parallel with, rather than sequentially before, exchange. Where a purchaser needs more time than a vendor is willing to grant as a single period, an extension mechanism tied to a specific trigger, such as awaiting a council response or a laboratory result, is more likely to be accepted than an open-ended request for additional time with no stated reason attached.

Modelling the due diligence period into your program

The due diligence period is not dead time sitting in the middle of a development timeline. It is the point at which the highest-uncertainty assumptions in the feasibility either get confirmed or the deal ends before real money is committed beyond the deposit. Treat it as a defined work package with its own deliverables and dates, rather than a passive waiting period, and sequence the investigations so the ones most likely to end the deal outright, a fatal planning constraint or an unworkable contamination finding, are resolved earliest. A purchaser who leaves the highest-risk check until the last week of the period has, in practice, given up most of the benefit of holding a due diligence condition at all.

What to check before you sign

Before signing, confirm that the condition names every matter you intend to investigate, that the termination right is not so heavily qualified that a court could later treat it as no real condition at all, and that the notice mechanism and deadline are unambiguous. Confirm what happens by default if no notice is given either way, since a poorly drafted clause can leave the condition deemed satisfied through simple silence. Have the special conditions reviewed by a property lawyer drafting for your specific investigation list, rather than adapting a standard clause used on a previous deal that carried a different risk profile.

Practical checklist

Before exchange, list every investigation you actually need to complete on this specific site, not a generic list of planning, title and contamination. Confirm each investigation is achievable within the proposed period, given realistic response times from council, service authorities and consultants. Confirm the clause gives an unambiguous right to terminate on genuine dissatisfaction, with a clear notice mechanism and a clear default outcome if the deadline passes without either party acting. Have a lawyer review the special conditions against your specific investigation list before you sign, not after. A due diligence period only protects the money you have not yet committed if the clause behind it was drafted to do that job in the first place.


Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.

Fact-checked: 19 July 2026 · Review by: 19 July 2027

Sources: legislation.vic.gov.au · legislation.vic.gov.au

Our standards·

Share this article

Get new articles by email

Weekly digest of new articles. No spam. Unsubscribe any time.

Was this useful? Try the tool this post is based on:

Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.

See Pro pricingFree tier stays free.