Debt, equity and mezzanine structuring for medium-density

How senior debt, mezzanine finance and preferred equity each price risk in a Victorian townhouse capital stack, and how to model the layers together.

·Written and fact-checked . Published .·6 min read

What applies

A medium-density project in Victoria is rarely funded by a single source of capital. Most feasibilities that stand up to lender and equity partner scrutiny are built on a layered capital stack: senior debt at the base, one or more subordinate layers above it, and sponsor or preferred equity at the top. Each layer sits in a different position in the repayment waterfall, and each is priced accordingly. Understanding how the layers interact, and where each one's risk actually sits, is the difference between a feasibility that reads as a spreadsheet exercise and one that a financier will actually fund against.

Senior debt is provided by an authorised deposit-taking institution or a specialist commercial lender and is secured by a first mortgage over the land and improvements. It is repaid first, at settlement or on refinance, which is why it carries the lowest margin of any layer in the stack. Its quantum is set by the lender's loan-to-cost and loan-to-value tests, and by the presale coverage condition attached to the facility. Because it sits first in priority, its pricing tracks the general cost of secured lending, which moves with the broader flow of housing and business credit; see the aggregate trend in the ABS Lending Indicators.

Mezzanine debt sits behind the senior facility in priority but ahead of equity. It fills the gap between what the senior lender will advance and the total funding requirement, and it is typically unsecured or secured by a second mortgage or a caveat, which is why its return expectation sits well above senior debt. Mezzanine providers are usually private credit funds or high-net-worth syndicates rather than deposit-taking institutions, so their pricing is negotiated deal by deal rather than published, and the terms can vary significantly between providers for what looks like a similar risk profile on paper.

Preferred equity and ordinary equity sit at the top of the stack. Preferred equity is repaid ahead of ordinary equity but behind all debt, usually with a fixed preferred return plus a share of profit above a hurdle. Ordinary equity, typically the sponsor's own capital, is repaid last and carries the residual risk and the residual upside. This is the layer most exposed to cost overrun, sales underperformance or delay, which is exactly why it demands the highest return.

How to model it

Model the capital stack as a waterfall, not as a single blended cost of capital. The practical steps:

  1. Set total project cost (land, construction, professional fees, finance costs, contingency and selling costs) as the funding requirement.
  2. Establish the senior debt quantum from the lender's loan-to-cost test and presale condition, and its all-in cost including establishment fee, line fee and interest margin.
  3. Size any mezzanine layer as the balance between senior debt and the equity the sponsor is willing or able to contribute, and price it against the return the mezzanine provider is actually quoting for this risk profile, not a generic assumption carried over from a prior deal.
  4. Size preferred equity, if used, against its stated preferred return and profit share above the hurdle.
  5. Run the residual cash flow, after debt service and preferred distributions, through to ordinary equity and calculate the return on that residual position under the base case and under the downside cases.
  6. Check the waterfall against the presale and drawdown timing established for the senior facility, since a mezzanine or preferred equity provider will often set its own conditions precedent tied to the same coverage milestones.

Illustrative structure

The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. Take a townhouse project with a $10 million total cost. Senior debt is advanced at 65 per cent of cost, or $6.5 million, subject to the lender's own presale coverage condition. Mezzanine debt fills a further $1.5 million, taking total debt to $8 million, or 80 per cent of cost. The remaining $2 million is sponsor equity. If the project completes on budget and sells to plan, the ordinary equity holder captures the residual profit after senior interest, the mezzanine return and any preferred distribution. If costs run 8 per cent over budget, that overrun is absorbed first by the ordinary equity residual, since the senior and mezzanine positions are repaid according to their contractual terms regardless of how the project actually performs. This is the mechanical reason ordinary equity's required return sits well above either debt layer: it carries the full variance of the outcome.

Sensitivity across the stack

A capital stack should be stress-tested the same way the underlying feasibility is. Two variables matter most. First, a change in the general cost of credit affects the senior facility's floating-rate margin directly, and it also affects buyer borrowing capacity, which feeds back into presale conversion and therefore into the timing of the senior drawdown itself. General guidance on how borrowing costs interact with an investment property's cash flow is set out for individual investors on the ASIC MoneySmart property investment page, and the same mechanical relationship between borrowing cost and serviceability applies at project scale. Second, a delay in achieving presale coverage extends the period every layer of the stack is exposed to holding cost, and because mezzanine and equity absorb that cost after debt service, a timing blowout compresses the return to the layers at the top of the stack fastest.

What to check before exchange

Before committing to a capital structure on a specific site:

  • Obtain indicative or executed term sheets from every layer of the intended stack, not verbal indications, and confirm the priority order and security position of each.
  • Confirm whether any subordinate lender or preferred equity provider requires an intercreditor deed with the senior lender, and what rights that deed gives each party on default.
  • Model at least one downside scenario in which construction cost rises and sales price softens simultaneously, and check which layer of the stack absorbs the shortfall first and by how much.
  • Confirm the trigger events under which a mezzanine or preferred equity provider can step in ahead of schedule, since these can differ materially from the senior lender's own default triggers.
  • Cross-check the assumed cost of each layer against current market pricing rather than the terms achieved on a prior project, since private credit pricing moves with the same broader credit cycle reflected in the ABS Lending Indicators.

Record keeping and review

Document every term sheet, every intercreditor position and every sensitivity run against the capital stack, dated and versioned, so the assumptions behind the funding decision can be reconstructed later. Lachlan Voss sets out this layered approach to capital structuring at greater length in his book, The Victorian Property Developer, because getting the priority order and the pricing logic right at the outset is what keeps a feasibility honest when a project does not go exactly to plan.


Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.

Fact-checked: 19 July 2026 · Review by: 19 July 2027

Sources: abs.gov.au · moneysmart.gov.au

Our standards·

Share this article

Get new articles by email

Weekly digest of new articles. No spam. Unsubscribe any time.

Was this useful? Try the tool this post is based on:

Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.

See Pro pricingFree tier stays free.