Compulsory acquisition and compensation for landowners
How the Land Acquisition and Compensation Act 1986 governs compulsory acquisition of Victorian land, the heads of compensation available to landowners, and why outcomes turn on fact-specific valuation evidence.
How land ends up reserved for acquisition
Some Victorian land carries a public purpose reservation in the planning scheme: a strip earmarked for a road widening, a corridor set aside for a future transport link, or a parcel identified for a school, drainage works or open space. A reservation on its own does not transfer ownership. It signals that the relevant authority, a council, a state agency, or the Crown, intends to acquire the land at some point, and it constrains what the landowner can do with it in the meantime, because a permit application on reserved land is assessed against that reservation.
Acquisition itself, the compulsory transfer of title, happens under a separate process governed by the Land Acquisition and Compensation Act 1986. A reservation can sit in a scheme for years, or decades, before the acquiring authority actually moves to acquire, and in some circumstances a landowner whose land has been reserved for a long period can ask the authority to acquire it rather than continue to wait, though eligibility for that mechanism is fact-specific and worth confirming with a planning lawyer against the landowner's particular circumstances.
The acquisition process itself
Where an authority decides to proceed, the Act sets out a structured process: a notice of intention to acquire, an opportunity for the landowner to respond, and a notice of acquisition that vests the land in the acquiring authority. The landowner is entitled to compensation as a consequence of that transfer, and the Act establishes both the entitlement and the framework for assessing the amount.
Valuation sits at the centre of the process. The Valuer-General Victoria provides valuations used in compensation assessments, and either party can commission its own valuation evidence where the amount is disputed. Because acquisition removes the landowner's ability to negotiate a market sale on their own terms and timing, the Act's compensation framework is built to put the landowner, so far as money can, in the position they would have been in had the acquisition not occurred.
The Act also anticipates that the parties may not agree on the amount, and it sets out a pathway for resolving a disputed claim rather than leaving the landowner with no recourse beyond accepting the authority's initial offer. A landowner who receives a notice of acquisition should treat the authority's first compensation offer as the opening position in a process, not as a final figure, and should get valuation and legal advice before responding to it.
The heads of compensation
The Act recognises several distinct heads of compensation rather than a single lump sum. Market value of the land taken is the anchor, assessed as at the date of acquisition. Beyond that, a landowner may be entitled to compensation for disturbance, the reasonable costs of relocating or reorganising that flow directly from the acquisition, and for what is often called injurious affection, a reduction in the value of any retained land caused by the severance or by the use to which the acquired land will be put.
The following figures are illustrative. They demonstrate the method and will vary by site, council and timing. Say an authority acquires a 400-square-metre strip along the road frontage of a larger holding for a road-widening project. The market value head might be assessed against comparable land sales for that strip alone. A disturbance head could cover the reasonable cost of relocating a boundary fence and reinstating landscaping disturbed by the works. An injurious affection head might apply if the road widening brings traffic closer to a dwelling on the retained land in a way that reduces its value, separately from the value of the land actually taken. Each head is assessed on its own evidence, and the totals in a real case depend entirely on valuation evidence specific to that site.
Why outcomes are fact-specific
Compensation outcomes turn heavily on valuation evidence, on the particular use and condition of the land, and on how the specific project affects the retained holding, and none of that generalises from one acquisition to another. Two landowners with adjoining, apparently similar parcels can receive materially different compensation because their retained land, existing improvements, and the project's specific effect on each parcel differ. This is not an area where a rule of thumb from a past acquisition should be relied on. A landowner facing acquisition, or considering buying land that carries a long-standing reservation, should get advice from a lawyer experienced in compulsory acquisition and, separately, from a valuer, before forming a view on likely compensation.
How to model acquisition risk in a feasibility
If a site under consideration carries any reservation, treat the reserved portion as land that may not be available for development yield, rather than assuming it will eventually be released back to the landowner's control. Where only part of a site is reserved, model the feasibility on the unreserved balance and treat compensation, if it comes, as a separate and uncertain cash flow with its own timing, not as development revenue.
This distinction matters most at the acquisition stage, when a purchaser is deciding whether to buy a site that carries a reservation at all. A discounted purchase price against a reserved parcel can look attractive, but the discount needs to reflect the real prospect that the reservation sits dormant for a long period rather than being acquired and compensated on any predictable schedule. Building a feasibility around an assumed near-term acquisition, without confirmation from the acquiring authority that a program exists, is a common way to overstate a site's near-term value.
Where a project's staging or access depends on land the developer does not own being acquired for supporting infrastructure, such as a road connection, build in a scenario where that acquisition is delayed, because the authority's own program for acquisition, not the developer's, controls when it happens.
What to check before you commit
Check the planning scheme mapping and the specific reservation provision affecting the site, and identify which authority holds the power to acquire. Ask that authority directly whether it has a current program or budget allocation for acquiring the reserved land, since a reservation with no funded program behind it can sit dormant for a long time.
If compensation is already in train or under negotiation, get the acquiring authority's position in writing and have it reviewed against independent valuation advice before relying on any figure in a settlement or in modelling a sale. Keep every notice, valuation and item of correspondence from the acquisition process, because compensation disputes can run for an extended period and a complete record materially strengthens a landowner's position if the matter proceeds to a formal valuation dispute.
Published by the SiteLogic Editorial desk. Every fact traces to a primary source. See our standards and corrections register.
Fact-checked: 19 July 2026 · Review by: 19 July 2027
Sources: legislation.vic.gov.au · land.vic.gov.au
Was this useful? Try the tool this post is based on:
Pro on SiteLogic. Logi: up to 60 messages a day. Logi also stops at US$15 of model cost in a Melbourne calendar month. The Developer Comms Kit and unlimited saved projects. The Strategy Lab simulator runs without Pro. Saving a scenario needs a signed-in account. $60/month or $600/year, ex GST. First 3 months are $30/month, ex GST, on monthly Pro.